Urban land, removed from the agricultural circuit, PUZ approved, for the project Modern industrial hall of type P+1E partially.
Direct access from DJ 141.
Area - 17,250 sq m (Intravilan Industrial).
Hall project:
Useful Production Area: 2,830 sq m
Total Developed Area: 3,259 sq m (including the offices on the first floor and the annexes).
PUZ approved (2024), DTAC phase completed (2025).
Location in the built-up area of Mosna, benefits from reduced local taxes (specific to the rural area) compared to urban industrial platforms.
Employee Facilities: Separately sized locker rooms (M/F), dining room and modern offices (meeting room, offices).
The project is prepared for the installation of photovoltaic panels and complies with European environmental and fire protection standards.
"Ready-to-Build" project, technically optimized for a large-scale production flow, with a land reserve that allows for tripling capacity in the future without major new urban planning efforts.